File information

Last updated

Original upload

Created by

Griz1231

Uploaded by

griz1231a

Virus scan

Safe to use

Tags for this mod

About this mod

The mod adds tracks to the track I feel are useful between the Sylva interchange and Bryson

Requirements
Permissions and credits
Changelogs
Griz1231's Track Improvements

V1.9.1 is an update for the experimental branch. East Whittier Interchange is completely redone. Bryson has been populated. Changes to the Whittier crossover and Bryson roundhouse due to basemap changes.

V1.2.0 brings some major changes to the east entrance to the yard in East Whittier to make it compatible with my new sugar mill and Ela Industries. It also has a complete rebuild of the Sylva interchange to a total of 24 tracks when fully expanded. It no longer interferes with the signals in Ela. There is no longer a hump at the yard in Whittier, but there is enough slope in the entrance track to work as one. The Sylva interchange is at a slight decline across its entire length, so make sure handbrakes are set.

This mod adds track in places I feel are useful. 
  • Sylva Interchange gets expanded to 22 interchange tracks and 1 track on each side to run around the yard. Starts with 4 interchange tracks and on bypass and expands in 4 stages.
  • Sylva Paperboard gets the spur on the northwest end connected to the main line.
  • Dillsboro yard gets the 2 stub tracks connected to the rest of the yard on the north end.
  • East Whittier yard/interchange gets a bypass track, additional crossovers, and the short track extended the full length of the yard. Also adds a large repair shed and an 11 track yard. V1.1.3 disables the 3rd track as an interchange and makes the 9 center tracks of the yard into interchange tracks
  • Whittier Sawmill gets 3 additional log unloading tracks and the stub connected to the yard. Also adds another track to each of the outputs
  • Whittier gets a crossover after Hollifield oil.
  • Ela has a track added to bypass the station.
  • Bryson coaling tower becomes pull through
  • Bryson turntable gets the track to coal/lumber supply connected to repair tracks behind the roundhouse for easier access.
  • Andrews Interchange is rebuilt into an 11 track yard with 7 interchange tracks.
  • Barker's Creek siding is extended
  • Sidings in Wilmot are Extended
  • Bryson roundhouse has additional tracks and the 2 storage tracks have been extended and made into repair tracks
  • Stenzel Manufacturing in Whittier gets an additional track

Requires Railloader, Alina's Map Mod, and Strange Customs.

Future plans are to rebuild the Sylva interchange again to match the new Andrews Interchange, and add progression milestones for the added features.

V1.9.5 Updated to move east end of Whittier yard to accommodate change in sign location and uses custom map masks to replace the numerous smaller masks used before. There may be a couple patches of gravel on the tracks near the sawmill.
V1.2.3 fixed issue with Sylva Interchange
V1.2.2 fixed switchstand in Andrews Interchange that was in middle of a track
V1.2.1 fixes missing switchstands at the east end of the Whittier Interchange
V1.0.2 adds connections to the Whittier engine shed and a storage track for diesel and parts next to the shed. Also cleaned up the mod code significantly.
V1.0.3 Bug fix
V1.1.0 adds a large yard and repair shed in Whittier, an additional track to the C2 and SO1/SO2 sections of the Whittier sawmill and expands the interchange in Andrews to 7 interchange tracks and a total of 11 tracks.
V1.1.1 Fixed bug with Whittier Sawmill SO1/SO2/SO3 tracks
As of V1.1.3 all areas have been broken up into individual files which can be easily disabled and a version with Sylva Interchange modifications disabled is available.

AMM_Whittier_Yard, East Whittier Crossover and Ela, Whitter Engine Shed, Wilmot Siding & Sylva Interchange run around mods are not compatible with this mod.

Join my Discord channel to contact me with issues or suggestions: Griz1231 Gaming